In context of moving range and individual control charts, UNPL stands for:
Universal Natural Process Line
Universal Natural Process Limit
Upper Natural Process Limit page 77
Upper Natural Process Line
Effort required to test a program to ensure that it performs its intended function __________
Testability page 68
Bug fixing
Debugging
Security
The extent to which a program can be expected to perform its intended function with required precision is called ______
Usability
Reliability page 67
Portability
Maintainability
___________ help in finding the matrix to be stable or unstable
Control chart page 75
Directed Graph
Cyclic chart
Base line graph
_________give you a better insight into the state of the process or product
Metrics page 66
Efficiency
Reliability
Usability
Determination of the ....................is a pre-requisite of all sorts of estimates, including,
resources, time, and budget.
software scope page80
software Risk
software Quality
software Management
We need to employ some statistical techniques and plot the result ---------------. This is
known as statistical control techniques.
Graphically page 74
Automatically
Manually
Personally
When more than one user interpret the same requirement in different ways then we can say that the requirements are
None of the given
Incomplete
Ambiguous
Incorrect
The extent to which a program satisfies its specifications and fulfills the customer’s mission objectives is …………………
Integrity
Reliability
Correctness page67
None of given
In case some software, it is extremely easy to operate with intuitive interface conforming to most excellent GUI practices of the industry. It needs very little training -----------------
Less than one hour
Less than two hour
Less than five hour
Less than ten hour
Metrics to assess the quality of the analysis models and the corresponding software specification were proposed ............
in 1993- 1999.
Ricado in 1993
Davis in 1990
Davis in 1993 page 71
Which statement is correct?
None of the given
The greater the dependency between the components the lesser is coupling
The lesser the dependency between the components the greater is coupling
The greater the dependency between the components the greater is coupling (getting together).
Function/Test matrix is a type of
Interim Test report
Final test report
Project status report page 126
Management report
The most important objective of any engineering activity is to produce high quality product with limited resources and-----------------------
Time page 66
Persons
Cost
Metrics
Extent to which access to software or data by unauthorized persons can be controlled and called ……….…
None of given
Efficiency
Reliability
Integrity page 67
The amount of computing resources required by a program to perform its function is __________
Efficiency page 67
Integrity
Reliability
None of given
______ technique was initially developed for manufacturing processes in the 1920’s by
Walter Shewart.
Upper Control Line
Control chart page 75
CMP
Quality
Several entities are always created -------------- and deleted together then this is a strong indication that they should be grouped into ---------- logical file/files.
Together, Single page 48
Together, Multiple
Together, Double
All of the given
In measuring Software Process Quality by using control charts, if the gap between the defects reported and defects fixed is increasing, then it means
The product is in unstable condition. Page 78
The product is ready for shipment
The product is in stable condition.
None of the above
This chart is then used to develop the individual control chart is called statistical control techniques.
Yes page 77
No
A _______ entity is the one which have any ----------- in the problem domain without
some other entity.
Strong, Role*
All of the given
Weak, Function
None of the Given P # 47 ( weak, doesn’t have any role)
___________ is a pre-requisite of all sorts of estimates, including, resources, time, and budget.
Software scope
software Risk
software Quality
software Management
ILF is a --------------- identifiable group of logically control informations ------------- the boundary of the application.
user, within
user, without
All of the given
user, along